2012 Nant de Drance power plant, Switzerland, ÖSTU Stettin                          Supply of a stage winch for passenger and freight transport 300/200 kN laid out after TAS. Supply of a rambler rig for passenger and freight transport 150/100 kN laid out after TAS.

 

2012 Kaunertal power plant, Austria, Swietelsky                                                 Pipe access system for transportation of passengers and material. Crane track construction with winches for distribution of the 150m deep vertical surge shaft. Supply of the shaft flap.

 

2012 Ferrera Hinterrhein power plant, Switzerland, Bauschutz                       Pipe access system for corrosion protection works consisting of working and equipment wagon, rope guide. Winch provided by customer.

 

2012 Wendefurth power plant, Germany, KBB Meissl                                       Pipe access system constisting of capstan winch, rope guide and pipe access wagon. Type approval test for the entire system.

 

2012 Kaunertal power plant, Austria, Planttech                                             Planning of the pipe access system in consideration of the local conditions (difficult access, restricted space for the position of the winch)                    manufacture, delivery and montage including acceptance and running of the pipe access system.

 

2012 Vianden 4 power plant, Luxembourg, DSD Noell                                  Inspection system for new penstock in Vianden                                               special: the basic-construction of the inspection platform is mounted on the cylindrical sluice, therefor the fitting got significantly facilitated. Type approval test.

 

2012 Linth Limmer power plant, Switzerland, DSD Noell                                   Pipe access system for passenger transport of the assembling personnel during new building of a penstock.

_______________________________________

 

2011 Happburg power plant, Germany, Koschutz                                                Pipe access system, horizontal shaft, consisting of capstan winch, working cage for working in horizontal and vertical areas, two rope technology, towing and security rope. Type approvaltest for entire system.

 

2011 Biasca power plant, Switzerland, Koschutz                                           Delivery and montage pipe access system for corrision protection works consisting of: personnel transport winch and working wagon for oblique shaft.

 

2011 Sils Hinterrhein power plant, Switzerland, Bauschutz                                Pipe access system for corrosion protection works consisting of working and equipment wagon, rope guide. Winch provided by customer.

 

2011 Linth Limmern power plant, Switzerland, DSD Noell

Supply of two heavy-duty 650kN winches for pipe transport

2011 Vianden4 power plant, Vianden, Luxembourg, DSD Noell

Supply of a heavy-duty winch for pipe transport. 260/-110kN freight/personnel, two-rope winch. Supply of a personnel transport system consisting of a 30 kN, two-rope winch and a working cage for vertical transport. Type approval test of the entire system. 


_______________________________________

2010 Rodund power plant, Austria, ARGE Bauschutz  Koschutz

Pipe access system for corrosion protection renewal at the Rodund pumped storage power plant, two cradles, two freight/personnel transport winches, rope guide, delivery and installation within six weeks of the initial discussions with the customer.

2010 Schwarzach power plant, Austria, KBB

Pipe access system for corrosion protection renewal, cradle with integrated personnel winch.



2010 Vianden power plant , Luxemburg, SEO

Individual pipe access system for pressure pipeline inspections.
 Type approval test for the entire system.
_______________________________________

2009 Kaprun power plant, Austria 

Rope guide and winch, structural protection for pipe access system.



2009 Vianden power plant, Luxembourg, Koschutz

Pipe access system for corrosion protection renewal, freight/personnel transport winch with 2 two ropes, personnel transport winch, 3 pipe access cradles, 2 mobile working platforms for vertical shafts.
_______________________________________

2008 Pirris power plant, Costa Rica, Andritz 

Planning for pressure pipeline assembly + pipe transport winch, pipe transport wagon for oblique shaft, powered pipe transport wagon for horizontal shaft.

2008 Wehr power plant, Germany, Bauschutz

Pipe access system for corrosion protection renewal, freight/personnel transport winch, pipe access cradle.
_______________________________________

2007 Cleuson Dixence power plant, Switzerland, MCE
Three pipe transport winches.



2007 Schafberg, overhaul, Austria, Salzkammergutbahn
Refurbishing of an inclined material lift winch.

2007 Ski jump, Austria, SV Wörgl

Material transport winch.

2007 Kops II power plant, Austria, Illwerke

Freight/personnel transport winch.



2007 Markersbach power plant, Germany

Pipe access system for corrosion protection renewal, freight/personnel transport winch.
_______________________________________

2006 Häusern power plant, Germany, Koschutz

Shaft access system.

2006 VA Stahl, MCE, VOEST

Continuous caster crane modifications, Linz.



2006 Kaunertal power plant, Austria, TIWAG

Access system with limited personnel transport.

2006 Parbati power plant, India, Gammon India

Personnel transport winch.



2006 Kaunertal power plant, Austria, Koschutz

Access system with limited personnel transport.
_______________________________________

2005 Reisseck power plant, Austria, Verbund

Inclined material lift system, personnel transport.


2005 Kops power plant, Austria, MCE

Pipe transport winch, personnel transport winch.



2005 Karahnjukar power plant, Iceland, DSD Noell

Pipe transport winch, personnel transport winch.



2005 Avesta steel plant, Sweden, VAI

Continuous caster segment manipulator. 
_______________________________________

2004 Kaprun power plant, Austria, Verbund

Shaft access system with winch.


_______________________________________
2003 Parbati power plant, India, Jägerbau

Pipe transport winch, personnel winch.


_______________________________________

2002 Kaprun power plant, Austria, Verbund


Assembly planning for pressure pipeline, inclined material lift for pipeline assembly and plant traffic.
_______________________________________

2001 Ghazi Barotha power plant, Pakistan, Hydro

Pipe access system for plant traffic.
_______________________________________

2000 Naturns power plant, Southern Tyrol, Koschutz

Pipe access system.



2000 Canon del Pato power plant, Peru, Hydro

Emergency gate winch.



2000 Musi power plant, Indonesia, Hydro

Pipe access system incl. winch.

_______________________________________

1999 Ghazi Barotha power plant, Pakistan, VA Tech

Pipe transport cradle, inclined lift for pipeline assembly.
  


1999 PSW Goldisthal, Germany, MCE

Pipe, personnel and freight transport winches.
_______________________________________

1998 Berke Dam power plant, Turkey, VA TECH

Chain winch.

_______________________________________

1997 Okutataragi power plant, Japan, VA Tech

Winch for tailrace gate l.



1997 Finchaa power plant, Ethiopia, VA Tech

Pipe access system including winch. 


_______________________________________

1996 Houay Hydropower, China, MCE

Assembly portal crane.
_______________________________________

1993 Brenner Motorway overhaul, Austria, Raffl

4 portal cranes.